Introducing various solutions from EMAX Hitech Co., Ltd.
Construction goals
Shortening product development periods through computerized project management
Establishment of product design information management and design change history management functions
Establishment of information sharing function through integrated DB management of product standard information (process standard information, product code, component parts, BOM, etc.)
Establishing a manufacturing standard setting function by entering work performance data
Building effect
Shortening the project period and making progress management easier
Maximize profitability by implementing cost reduction measures in product development
Maximize work efficiency by sharing product standard information (BOM, etc.) registration information
Establishing a business linkage system by establishing a BOM change history management and sharing system
Ensuring convenience of inter-departmental work cooperation through sharing and distribution management through drawing management
Project Management
It manages item master and BOM information, and supports change history management for ECO, etc.
Supports APQP, other drawing/document management, model management, etc. related to project and new product development.
Project Progress Status (APQP)
Project progress by stage
BOM Management
It manages item master and BOM information, and supports change history management for ECO, etc.
Supports E-BOM, M-BOM, and product-specific material cost calculation.
BOM registration
Material cost status by product
Model BOM registration
M-BOM(Explosion)
Drawing/Document Management
This is a drawing management and document management system provided by the PLM system. It provides both drawing revision management and document change history management.
APQP
It is possible to manage business improvement projects in the process of project and new product development, and it is operated in an integrated manner with document management, enabling all types of document management.
Project progress status